Your offshore coordinator knows which customers need a call, where an installation pack is waiting and which exception needs the director. Then a planned week of leave arrives, or a connection fails halfway through the morning. The work still exists, but its next step may be known only to one person.
A continuity plan makes those next steps available to an authorised backup. It also identifies work that must wait when the right people or systems are unavailable. The useful question is not whether someone can always be online. It is whether the business can make a controlled decision about the work that matters.
The following is an original planning framework for a small Australian and offshore team. Adapt the priorities and timings to your customers, agreements and actual capacity.
Decide which services need cover first
Start with customer-facing workflows, rather than a list of employees. For each workflow, identify the consequence of an interruption and the point at which somebody must act. An appointment change due this afternoon has different consequences from a monthly report due next week.
Business.gov.au's emergency-planning guidance starts with worker safety and separates continuity preparation, immediate response and recovery. It also covers critical services, customer contact, training and information backups. Read the emergency management planning guide.
Build a short service list: customer enquiries, appointment changes, document collection, technical escalations and reporting. Give each an owner, coverage window, interruption tolerance and recovery priority. Those are internal planning decisions; they do not replace contractual or regulatory deadlines.
Record the time zone beside every deadline. A handover saying “before 3 pm” is incomplete for a distributed team. Also record what can safely pause and who may approve an altered customer commitment.
Give the backup enough context to act
Assign a primary and a backup for each critical workflow. Confirm that the backup has capacity as well as the right training and approved access. Someone whose own queue already fills the day cannot absorb another full workload simply because their name appears in a plan.
Use a shared work register that shows the current stage, last completed action, next action, deadline, source record and decision owner. Keep sensitive records in their approved systems; the continuity register can link to them without copying everything into another spreadsheet.
For planned leave, the primary owner prepares the register and walks through unusual cases before the handover. The backup repeats the next action in their own words. Resolve unclear instructions while both people are available, then agree when ownership transfers and returns.
Our SOP guide helps turn those explanations into reusable instructions. A document still needs someone who can find it, understand it and use it under the actual permissions available.
Build a coverage matrix around real limits
Consider a fictional solar business preparing for its coordinator's leave. Its coverage matrix could look like this:
| Workflow | Backup action | Decision retained by |
|---|---|---|
| Appointment changes | Check available slots and propose approved alternatives | Scheduling lead for exceptions |
| Missing job documents | Request specified evidence and record receipt | Job owner for disputed records |
| Customer status updates | Send a verified milestone and next contact time | Manager for revised commitments |
| Conflicting equipment details | Record the conflict and notify the responsible reviewer | Authorised technical professional |
| Routine weekly report | Prepare the agreed figures, or defer with approval | Operations manager |
This example grants no additional professional authority. Covering administration does not qualify the backup to approve a design, certify work or resolve a technical discrepancy. If the required reviewer is unavailable, the plan should identify an appropriate alternate or keep the affected decision paused.
Agree temporary access before it is needed and give it an end date. Our secure onboarding checklist explains how to provide identifiable accounts and review permissions. Cover should not depend on borrowing an absent colleague's login.

Write separate responses for people and system outages
When one person is unavailable but systems work, the backup can take ownership through the agreed handover process. When the CRM is unavailable to everyone, adding more people to the same broken screen will not restore service.
List the systems each critical workflow depends on, including communication, identity access and document storage. Agree who checks a service problem, who contacts the provider and who can authorise a temporary working method. Avoid making one unavailable application the only place where the response contacts are recorded.
A fallback might allow an authorised colleague to record a minimal request in an approved temporary queue. Define which fields are permitted, where the queue is stored, who can access it and how it will later be reconciled. Do not improvise by exporting a full customer database to personal devices.
For a possible security incident, use the incident response process rather than treating every outage as a routine access problem. During a physical emergency, people should follow local safety instructions; the business's coverage plan should carry the work without pressuring them to remain online.
Practise the handover before depending on it
Run a small, announced drill with fictional or approved test records. Tell the backup that the primary coordinator is unavailable for the exercise and provide three cases: a routine enquiry, a deadline approaching and a decision outside their authority.
Observe whether they can find the current record, identify the next step, reach the decision owner and explain what the customer should expect. Note where time is lost. A missing folder permission and an unclear approval rule require different fixes.
Then practise a system-unavailable scenario without disrupting production. Can the team find its contacts and describe the approved fallback? Do not disable live systems merely to make the exercise realistic.
Record the gaps, an owner for each correction and a date to repeat the affected part. After a staff or system change, check whether the same plan still works. A successful drill provides evidence about that scenario; it is not a guarantee of uninterrupted service.
Restore one trustworthy work queue
When the person or service returns, reconcile work before handing everything back. Check temporary entries against the main system, identify actions already completed and resolve duplicates before sending further messages or repeating changes.
Confirm which customer commitments remain open and who owns them. Remove temporary access when its purpose ends, while retaining business records through the normal retention process. The returning colleague should receive an updated queue, not a pile of disconnected chat messages.
Review the interruption with the people involved: which services continued, what waited, what customers needed and which dependency caused the delay. Change the plan where the evidence justifies it.